GPW_AR_2013_Final_v10.pdf
Branch operations and production
Deviation from planned
Actual achievement 2012/13
Actual achievement 2011/12
Comment on deviations
Planned target 2012/13
Performance indicator
target to actual achievement for 2012/13
Quantity of examination scripts printed
100% of required examination scripts produced within clients speci ½ ed time frames
Produce 100% of the required number of examination scripts within the client’s speci ½ ed time frames Develop and maintain SOPs for all security printing material
100% of the required 16,518,188 examination scripts were produced within the client’s speci ½ ed time frames. An SOP document was developed, with the purpose of establishing best practice procedures pertaining to preparation of documents prior to printing, during the printing, binding and dispatch processes of all printed documents No losses of passports due to theft No losses of identity documents due to theft No losses of examination scripts due to theft
Target achieved
Develop and maintain SOPs for all security printing material
New strategic objective for 2012/13
Target achieved
-
Loss indicator Passports
New strategic objective for 2012/13 New strategic objective for 2012/13 New strategic objective for 2012/13
Maintain a zero rate of loss
Target achieved
-
Loss indicator identity documents
Maintain a zero rate of loss
Target achieved
-
Loss indicator examination scripts
Maintain a zero rate of loss
Target achieved
-
Strategy to overcome areas of under performance The GPW‘s disaster recovery site for the production of identity documents and passports will also be used as a testing site for software upgrades on personalisation machines. This will reduce the risk of technical problems being identi ½ ed in a live system whenever upgrades are implemented. Due to the re-prioritisation of procuring equipment to be utilised for production of the new smart ID card, the total number of planned equipment items could not be achieved. Since procurement related to the smartcard has since been completed, the outstanding equipment items will be added on as additional items for the 2013/14 ½ nancial year.
Changes to planned targets No changes to planned targets
71
GPW ANNUAL REPORT 2012 | 2013
Made with FlippingBook Digital Publishing Software