CAV Annual Report 2021

“SUPPORT THE GROWTH OF THE AEROSPACE, DEFENCE AND ADVANCED MANUFACTURING INDUSTRIES”

Deviation from planned target to actual achievements 2020/21

Actual Achievements 2020/21

Performance Indicator Annual target 2020/21

Landside Development

Not Achieved At the end of Q3, CoT was yet to approve the drawings for Roads & Storm-water Services.

Deviation Construction commencement will only be after GDARD has approved the EA if required. The start of construction will also be upon Cot approving the drawings for Roads & Storm- water Services as well as the Wayleaves for construction. Deviation Construction will only commence upon CoT approving the drawings and the Wayleaves. Deviation At the end of 2020/21FY, the Environmental Consultants had already submitted the technical report for the GA & WULA to DWS. Deviation At the end of 2020/21FY, the Environmental Consultants had already submitted the technical report for the EA to GDARD. Deviation Construction commencement will only be after GDARD has approved the EA, DWS approving the GA & WULA. The start of construction will also be upon CoT approving the Wayleaves for construction.

• Construction commencement by Jodan Konstruksie (Q3);

Not Achieved In 2019, the latest version of the designs (drawings) was submitted to City of Tshwane (CoT) for approval to upgrade van Ryneveld & van der Spuy road intersection. At the end of Q4:2020/21FY, CoT was yet to issue the final drawings approval irrespective of the follow-ups made. Not Achieved WULA (sewer): At the end of Q3, the environmental consultants were still interacting with the affected stakeholder to sign a consent forms for pipe installation along their farm. environmental consultants were still busy with the EA application process. Not Achieved At the end of Q3, the environmental consultants were still busy with the EA, GA & WULA application processes. The CoT is yet to approve the already submitted for drawings for roads & storm-water services Not Achieved At the end of Q3, the

• Practical Completion of the works by Jodan Konstruksie (Q4).

Water & Sanitation will be concluded through: • General Authorisation and Water Use License Application approval by Department of Water and Sanitation (Q3); • Environmental Authorisation approval by Gauteng Department of Agriculture and Rural Development (GDARD) (Q3);

• Construction commenced by Jodan Konstruksie (Q3);

CENTURION AEROSPACE VILLAGE NPC I ANNUAL REPORT I 2020/21