RAND WATER ANNUAL REPORT 2023

HOW WE CREATE VALUE

Solved Soil Erosion Cases

20%

20%

10%

10%

20%

20%

c STM c PCR c TR c OF c RC c SC

Rand Water has implemented the following projects during the 2022/23 Financial Year as part of environment and sustainable development initiatives with the purpose of controlling the erosion thereby conserving our natural resources and reducing environmental harm.

Table17: Implemented Erosion Control Projects Implemented erosion control projects - 2022/23

Project Name

Area

Cause of the problem Coordinates

L7 & K10 pipeline

Springs

Traffic (TR)

26°11’54.20”S

28°26’3.63”E

Klipfontein reservoir

Esselen park

Overflow (OF)

26° 4’44.91”S

28°11’11.04”E

H12 pipeline

Centurion

Storm Water (STM)

25°55’4.57”S

28°10’53.08”E

Witpoortjie reservoir

Kagiso

Poor Construction Rehab (PCR)

26° 9’18.96”S

27°47’34.96”E

Eikenhof station

Eikenhof

Overflow (OF)

26°18’36.41”S

27°58’39.11”E

F44 pipeline

Leratong

Traffic (TR)

26°10’35.19”S

27°48’45.69”E

F44, 15 & 32 pipelines

Braamfischer

Traffic (TR)

26°11’32.41”S

27°51’3.60”E

F44, 15,32 &12 pipelines

Braamfischer

River crossing (RC)

26°11’39.29”S

27°51’47.99”E

BG1 pipeline

Vischgat

Storm water (STM)

26°46’41.77”S

28° 2’3.24”E

Barrage depot

Barrage

Overflow (OF)

26°45’53.72”S

27°40’42.66”E

133