Table 21: Variation and expansion of contracts which were above 15% of the original contract:

Value of previous contract expansion or variation of contract

Value of contract expansion or variation of contract

Reason for expansion or variation of contract

Project Description Name of Supplier Contract Number

Original contract value

Contract start date

Contract expiry

No

Award Date

1 New office premises requires additional

Centurion Vision Development (Pty) Ltd (Reg. No 2004/010063/07)

SLA031-2022/23 It was noted that five of the six

R30,202,620.72 R183,413.39 R5,748,672.22 23 May 2023 16

15 November 2027

November 2022

rooms included in the approved space layout, there was an omission of fire related walls surrounding the building structure.

variation for the fire proof on the store rooms.

2 Application of VAT apportion ment ruling.

Pricewaterhouse Coopers Tax Services (Pty) Ltd (Reg.No 1983/008289/07)

ECIC87Q-2021/22 To finalise the Value Added Tax (VAT)- apportionment method, the contract must be varied due to:

R146,846.00 R155,250.00 R0.00

09 June 2023 04 February 2022

When SARS finalises the VAT ruling.

1. Accepting SARS current method will reduce ECIC’s Input VAT apportionment ratio thus resulting in ECIC claiming less VAT on mixed expenses. 2. Appointing another service provider to assist with the IMU apportionment will not be beneficial as a lot of work has also been done by PWC.

3 Maintenance of the existing four (4) online calculators and

Big Mouth Marketing (Pty) Ltd t/a WOW interactive (Reg no. 2014/049735/07)

ECIC11Q-2021/22 1. Due to the nature of the services, it will be impractical to obtain three quotes as we require the specific services of Wow Interactive with whom the current website domain and

R205,923.46 R76,820.00 R0.00

06 September 2023

21 July 2021

31 August 2024

development of three new online calculators on

the ECIC website.

server is with. In this instance, the only viable option is for WOW Interactive to continue with the development of the remaining calculators as well as the overall maintenance of the calculator’s platform system during their contractual period with ECIC.