DID ANNUAL REPORT 2022 23
Annual Report 2022-2023
Reasons for revisions to the Outputs / Output indicators / Annual Targets
The output indicator was cascaded down to the Operational Plan.
Reasons for
deviations
Indicator was
scheduled to be
reported on in
the latter part of the year.
Deviation from
planned target to Actual
Achievement 2022/2023
- Approved design concept
*Actual
Achievement 2022/2023
until date of re-tabling
Planned
Annual
Target
2022/2023
- Approved design
concept
Audited
Actual
Performance 2021/2022
Audited
Actual
Performance 2020/2021
Concept
document and design
approved
Output
Indicator
Approved
concept
document on the
establishment of fully
functional GPG Public
Infrastructure
Nerve Centre
Programme / Sub-programme: Outcome Output Capable, GPG Public
Infrastructure
Nerve Centre (Centre of
Excellence)
established
ethical, and
developmental
organisation
51
DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT
Made with FlippingBook - Online magazine maker