Annual Report 2023/2024 Mpumalanga: Department of Economic Development and Tourism - Vote 6
Reasons for
deviations
Shortlisting of
Board member not yet
concluded
Deviation
from planned target to Actual
Achievement 2023/2024 Board
Nominations received
but not yet
finalised.
Amend
Township
Establishment to
accommodate
investors not finalised
Engineering
companies
in existing
contract not
conforming
to required
specifications
**Actual
Achievement 2023/2024
Not achieved.
Progress to date:
Capacitation of SEZ Entity:
The call for
nominations to
serve on the SEZ
Board has been
authorized and advertised
Legal opinion
obtained from State Law
Advisors on the
establishment of
the SEZ Entity as
a wholly owned subsidiary of MEGA.
Planned
Annual Target 2023/2024
Interim Phase
of the Nkomazi SEZ finalised,
focusing on
SLA execution
covering mainly
Capacitation of SEZ Entity Amend
Township
Establishment to
accommodate investors Detail
engineering designs
Audited
Actual
Performance
2022/2023
Township
establishment
was approved.
The required detailed
engineering
designs of both
the wastewater treatment
plant and water treatment plant were
completed in
line with WULA processes
Sub-Programme: Strategic Initiatives Purposes: To position the industrial sector as a key contributor to economic growth and development Outcome Output Output Indicator Audited Actual Performance 2021/2022 Inclusive, diversified and growing economy Ensure that five key (5) programmes to drive the Mpumalanga Industrial Development Plan are implemented Capacitation of SEZ Entity, Township Establishment and Detail engineering designs finalised Interim Phase of the Nkomazi SEZ implemented as follows: Township Establishment was concluded General Plan was surveyed and submitted to the Office of the Surveyor General for approval The SEZ Strategy & APP documents approved