Disclosure Note: Output for number of facilities provided has been reduced from 6 to 3 as award letters are not deemed adequate as supportive evidence. 1.4.2 Number of utilisation inspections conducted for office accommodation 4 4 4 4 No deviation Not Applicable 1.5.1 Number of immovable assets verified in the Immovable Asset Register (IAR) 8 336 6 585 6 256 6 334 78 Overachievement due to additional assets that were not included in 2023/24 FY and assets surrendered, and new additions. 1.5.2 Number of immovable assets transferred from the Immovable Asset Register (IAR) - 184 200 209 9 The overachievement is due to assets being devolved to municipal custodians. 2.1.1 Number of Infrastructure designs ready for tender (IDMS Gate 4) 11 25 23 21 -2 See details on breakdown below Education 11 11 19 18 1 Laerskool Generaal Nicholaas formed part of the 2024/25 FY APP but the designs for it were pre achieved on 8 February 2024 which relates to the 2023/24 financial year.
11 7 6 3 3 Variance due to an
audit finding which
found award letters inadequate as a
portfolio of evidence.
PART
Deviation
target to Actual Achievement 2024/2025
from planned
**Actual
Achievement 2024/2025
Target
Annual
Planned
2024/2025
Actual
Audited
Performance 2023/2024
2 Programme 2: Public Works Infrastructure Outcome Output Output Indicator Audited Actual Performance 2022/2023 1.4 Provision of office 1.4.1 Number of facilities provided
2.1 Design of
infrastructure projects
1.5 Compliant
Immovable Asset
Register produced
accommodation to user Departments
2. Efficient and effective delivery of
smart public
infrastructure