GDID ANNUAL REPORT 2024/25
• The target was reduced from 12 to 10.
• The project was replaced by Dr George Mukhari
(procure, install, test and
commission new 11 kV
underground cables).
Output indicators / Annual Targets
Reasons for revisions to the Outputs /
The project was
replaced by Dr George Mukhari (procure, install, test and
commission new CCTV cameras). The Project was replaced by the
Dunswart Laundry.
The project was
replaced by Medical Supply Depot.
Project has been moved from the APP due to
Department of health non-availability of budget.
Project has been moved from the APP due to
Department of health non-availability of budget.
Villa Heidi - Non
Edenvale – Due
PART
deviations
Reasons for
New indicator 10 12 4 -8 Rahima Moosa – Non
Dr Yusuf Dadoo – Non
Baragwanath – Non
Ekangala Clinic - Non
confirmation of budget by the client (DoH).
confirmation of budget by the client (DoH).
confirmation of budget by the client (DoH).
to non-payment of PSP by the DoH.
Chris Hani
confirmation of budget by the client (DoH).
confirmation of budget by the client (DoH).
from planned target to Actual
Deviation
Achievement 2024/2025
*Actual
until date of re-tabling
Achievement 2024/2025
Target
Annual
Planned
2024/2025
Actual
Audited
Performance 2023/2024
Actual
Audited
Performance 2022/2023
Programme 2: Public Works Infrastructure Outcome Output Output Indicator 3.2 Electro-Mechs commissioned in health facilities 3.2.1 Number of Electro-Mechs commissioned at health facilities