GDID ANNUAL REPORT 2024/25
Output indicators / Annual Targets Simunye - Not
Reasons for revisions to the Outputs /
Revision is due to the
underperformance of the appointed contractor.
The project was
removed from the APP
due to the contracting
processes taking longer than anticipated.
See details on
breakdown below
The project was
removed from the APP
experienced delays in as it experienced delays in appointment Robin Hills – appointment
Non-achievement due to delays in contracting The target is revised due to delays in contracting. Lenasia - No No revision
Revision was as a result of the delays in
finalising the designs.
Rus Ter Vaal Secondary School - the
PART
deviations
Reasons for
completed due to
contractor failing to fulfil the
obligation of the contract.
contracting
processes took longer than
anticipated.
5 13 11 4 -7 See details on breakdown below
Education 5 13 9 3 -6 Thubelihle
Intermediary School –
variation at the
time of revision.
Athlone Girls High -
No variation at the time of revision.
from planned target to Actual
Deviation
Achievement 2024/2025
*Actual
until date of re-tabling
Achievement 2024/2025
Target
Annual
Planned
2024/2025
Actual
Audited
Performance 2023/2024
Actual
Audited
Performance 2022/2023
Programme 2: Public Works Infrastructure Outcome Output Output Indicator
2.2.2 Number of facilities
Refurbished,
Renovated and Refurbished
53
DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT