GDID ANNUAL REPORT 2024/25
reduced from 400 to 250
• The Department was relying on the Health maintenance
programme valued
at R1.2 billion for
the achievement of this target.
• The delays in the finalisation of the
SLA between Health
and DID entails that there are no maintenance
projects being
allocated to
emerging black firms.
Output indicators / Annual Targets
Reasons for revisions to the Outputs /
• The target was
PART
deviations
Reasons for
150 -250 There were fewer
appointments
due to limited
Departmental budget on
goods and services
from planned target to Actual
Deviation
Achievement 2024/2025
*Actual
until date of re-tabling
Achievement 2024/2025
Target
Annual
Planned
2024/2025
235 400
Women:
40% Youth: 30%
Other: 30%
Actual
Audited
Performance 2023/2024
Actual
Audited
Performance 2022/2023
229
Women: 38%
Youth: 19%
2 Table 2.4.4.1: Report against the originally tabled Annual Performance Plan until date of re-tabling Programme 1: Administration Outcome Output Output Indicator 4. Increased contribution of infrastructure spent to socio economic development 4.2. Emerging black firms empowered through subcontractors 4.2.1. Number of emerging black firms empowered through contracting and sub contracting per annum, of which 40% are women owned and 30% are youth-owned